金屬管 Steel Pipe
F-Rating:2 Hrs
施工流程說明
Installation Instructions
1. 清除開孔
Clear the hole
2. 裁切密度64K岩棉緊密塞入開孔並預留適當之厚度於牆板及樓板兩側
Install backing material into the opening,and recess backing material in appropriate depth of caulk from both sides of wall and top surface of the floor.
3. 塗抹適當之厚度Metacaulk 1200至預留的凹處並且表面抹平
Gun,trowel and/or pump Metacaulk 1200 firestopping sealant to appropriate depth on both sides of wall and top surface of the floor,and flush to a smooth defect-free finish.
分類
金屬管 Steel Pipe (F-Rating:2 Hrs)
塑膠管 Plastic Pipe (F-Rating:2-3 Hrs)
電纜線架 Cable Tray (F-Rating:3 Hrs)
保溫管 Insulated Pipe (F-Rating:2-3 Hrs)
風管 Air Duct (F-Rating:3 Hrs)
保溫風管 Insulated Air Duct (F-Rating:3 Hrs)
金屬管 Steel Pipe (F-Rating:4 Hrs)
塑膠管 Plastic Pipe (F-Rating:4 Hrs)
電纜線架 Cable Tray (F-Rating:4 Hrs)
保溫管 Insulated Pipe (F-Rating:4 Hrs)
風管 Air Duct (F-Rating:4 Hrs)
牆頂間隙Head of Wall Joint (F-Rating:2 Hrs)