公司簡介
工程實績
原廠簡介
產品簡介
系統介紹
代理銷售
認證介紹
下載中心
聯絡我們
保溫管Insulated Pipe
F-Rating:2-3 Hrs
施工流程說明
Installation Instructions
1. 清除開孔
Clear the hole
2. 裁切密度64K岩棉緊密塞入開孔並預留適當之厚度於牆板及樓板兩側
Install backing material into the opening,and recess backing material in appropriate depth of caulk from both sides of wall and top surface of the floor.
3. 塗抹適當之厚度阻火密封劑至預留的凹處並且表面抹平
Gun,trowel and/or pump Metacaulk firestopping sealant to appropriate depth on both sides of wall and top surface of the floor,and flush to a smooth defect-free finish.
4. 安裝適當尺寸之阻火紮帶/套環於牆板兩側及樓板下方
Install appropriate size Metacaulk Wrap Strip/Collar on both sides of wall and bottom side of the floor.
分類
金屬管 Steel Pipe (F-Rating:2 Hrs)
塑膠管 Plastic Pipe (F-Rating:2-3 Hrs)
電纜線架 Cable Tray (F-Rating:3 Hrs)
保溫管 Insulated Pipe (F-Rating:2-3 Hrs)
風管 Air Duct (F-Rating:3 Hrs)
保溫風管 Insulated Air Duct (F-Rating:3 Hrs)
金屬管 Steel Pipe (F-Rating:4 Hrs)
塑膠管 Plastic Pipe (F-Rating:4 Hrs)
電纜線架 Cable Tray (F-Rating:4 Hrs)
保溫管 Insulated Pipe (F-Rating:4 Hrs)
風管 Air Duct (F-Rating:4 Hrs)
強頂間隙Head of Wall Joint (F-Rating:2 Hrs)

電子郵件 | 網站地圖 | 關於我們
© 2006 Kinpo Corporation. All rights reserved . Homepage since 2006/12 .
.Homepage Design by Hinoworker .